Qualifications
B.Tech. (Chemical Technology Specialization in Paint Technology) with 60.8% from Harcourt Butler Technological Institute (HBTI), Kanpur, 1983
B.Sc. with 66.3% from Rohilkhand University, 1980
Intermediate with 66.6% from U.P. Board, 1977
High School with 63.4% from U.P. Board, 1974
Work Experience Synopsis
• Total 27 Years experience in Production, Quality Assurance & Quality Control in Chemical, Oil & Gas, Power related & Other Projects.
• Ensuring the Quality Objective relevant to functions & levels with-in the Organization is established, measurable & consistent with the EHS & quality policy.
• Extensive experience in Planning, Production, QA/QC to achieve the targeted volume production as well as achieving maximum asset utilization and labor productivity.
• Proficient in resource planning, vendor management for ensuring seamless production activities.
Key Performance Areas:
Quality:
• Ensuring the Quality Objectives relevant to functions & levels with-in the organization are established, measurable & consistent with the quality policy.
• Ensuring conformity to Quality Management Systems like ISO, FMEA, OHSAS, TQM, 6Sigma, 5S, Kaizen etc.
• Designing internal controls and checks as well as verification of efficiency levels.
Production:
• Handling the complete production activities to meet production targets for Painting Shop, Electro-Plating Shop, Plastics Molding Shop & Effluent Treatment Plant.
• Performing process planning & progress monitoring according to the order receipt.
• Generating various MIS reports pertaining to production, purchase, consumption etc.
Vendor development / Materials management:
• Preparing budgetary requirements of the material purchase to ensure ready availability of the various parts & raw materials.
• Identifying cost effective vendors for purchase of various raw materials & equipments required.
Experience Details
1 – From 08.09.2013 to 24.06.2014
Company: Arabian Bemco Contracting Co. Ltd., Kingdom of Saudi Arabia
Position: Painting & Insulation Supervisor
Main tasks:
An ISO 9001:2000 certified company associated with the construction of EPC, projects in Civil, Electro-Mechanical, Electrical & Instrumentation in the field of Industrial & Power Generation Projects, undertaking contracts in Saudi Electricity Company etc. Bemco has participated in implementation of numerous large & prestigious Power Projects, ranging from simple cycle to combined cycle technology. Bemco has undertaken more than 16,000 MW of power generation projects in Kingdom of Saudi Arabia & in the gulf region. (Employees 18000)
• Responsible for Planning, scheduling & monitoring of production activities on daily basis.
• The painting involving the facilities of Surface preparation, painting of chemicals storage tanks (Internal & External), different chemicals lines, Structures, Pressure Vessels etc as per the specified drawings, painting specifications & systems.
• Executing the insulation & cladding works for piping & equipment (hot, cold & acoustic insulations) as per project specification & method statement.
Worked on the following Projects: QCCPP (Qurayyah Combined Cycle Power Plant), Saudi Arabia with the client Saudi Electricity Company (SEC)
2 – From 08.09.2008 to 21.01.2013
Company: Al Hassan Engineering Co. SAOG, Sultanate of Oman
Position: Sr. Painting / Coating Inspector – QA/QC
Main tasks:
An ISO 9001:2000 certified company associated with the construction of EPC, projects in Civil, Mechanical, Electrical & Instrumentation in Oil & Gas sector, undertaking contracts in PDO, Power Plants, Refineries etc. (Employees 5000)
• Responsible for Planning, scheduling & monitoring of activities on daily, weekly and monthly basis and preparation of the reports.
• Responsible for the inspection of surface preparation for painting, insulation & refractory fireproofing systems as per the desired climatic conditions of underground & above ground piping, Corrosion prevention, holiday testing etc & submitting the reports to the Client as per the ITP.
• The painting involving the facilities of Grit blasting, Water Jet for salt contamination for Storage Tanks painting, 3 Layer Polypropylene coating on gas pipe line, field joints coating, painting & insulation of different chemicals storage tanks, Foam Solution lines, Fire Water lines, Steam lines, different chemicals lines, Condensers, CS & DSS Spools, Structures, Pressure Vessels, Heat exchangers, Reactors etc as per the specified Drawings, Painting Specifications & Systems.
• Involving in executing the thermal insulation & cladding works for piping & equipment (hot, cold & acoustic insulations) as per project specifications & systems
• Involving in Quantity Surveying , Preparing ITP / QCP & Method Statement for different Painting Projects as per the Client requirements etc.
• Preparing Mechanical Test Packages for hydro test having Fit-up, Welding reports, NDT i.e. RT, PT, PMI reports etc.
• Preparing Civil Test Packages having Survey / Excavation, Backfilling, Field Density Test Reports, Blinding Concrete Prepour & Placement Reports, Bitustick Membrane Reports, Screed Concrete Prepour & Placement Reports, Structural Concrete-Raft, Wall, Walkway, Slab, others – Rebar Reports, Concrete Placement Reports etc.
• At A’Seeb Waste Water Project, Oman & responsible for Civil & Painting QA/QC activities of under construction of STP, SBR tanks, Aerobic tanks, TE tanks, Pump Stations, Manholes & Installation / laying of 5 km long, 1400 mm dia HDPE Sea Water Outfall line etc.
• Participate in Root Cause Analysis and failure investigations.
Worked in the following Projects:
• Abu Tubul Pipeline Project, Oman, Installation of 85 Km long, 16 & 8 inch Dia CS pipe lines with the Client Worley Parsons Resources & Energy and Oman Oil Company Exploration & Production LLC.
• A’Seeb Waste Water Project, Oman with the Client Hyundai Rotem Engineering Co. & Parsons International Ltd. Co.
• Barka Power Plant Project, Oman with the main Contractor GS Engineering & Construction Co. Seoul, Korea.
• Kauther Depletion Compression Project, PDO-Oman with the Client Petrofac Engineering & Project, Oman with the main Contractor GS Engineering & Construction Co. Seoul, Korea.Construction Co.
• Co-generation Power Plant Project, Oman with the Client Oman Refineries & Petrochemicals Company LLC. Muscat.
• Aromatics Oman L.L.C. Sohar Project, Oman with the main Contractor GS Engineering & Construction Co. Seoul, Korea
• Shalalah Methanol Project, Oman with the main Contractor GS Engineering & Construction Co. Seoul, Korea.
3 – From 21.07.2007 to 31.07.2008
Company: Advance Industries of Arabia Co. L.L.C., Zarka, Kingdom of Jordan
Position: Painting Engineer
Main tasks:
• The Company producing NIMR, an off-road extreme utility military 4×4 and 6×6 tactical & multipurpose Station Wagon, Cargo, Armored Vehicle, designed & manufactured by Bin Jabr Group Ltd., Abu Dhabi through its Unit AIA Co. L.L.C., Jordan.
• Efficiently managed the functioning of Paint Shop & designed the complete Process Sheets of different painting systems.
• Painting plant involving the facilities of Sand / Shot blasting, Spray painting lines, Ovens, Testing lab etc.
4 – From 22.04.2006 to 05.05.2007
Company: Faisal M. Qahtani Sons Co., Al-Khobar, Kingdom of Saudi Arabia
Position: Painting Engineer – QA/QC
Main tasks:
• The leading Oil / Gas pipe line specialist & general contracting Company undertaking Saudi Aramco contracts of Cross Country pipe lines, Refineries etc.
• Efficiently managed the QA/QC activities of Grit blasting, Fusion bonded Epoxy Coating of Field Girth Welds external & internal by robotic system (Al-Qahtani Coating) for 300 Km long, 36 inch Dia CS pipe line, Corrosion prevention, Wrapping / Heat Shrink Sleeve application, coating of Structures, Spools, Pressure Vessels, Tanks etc as per the SSPC & Saudi Aramco Engineering Standards & Specifications.
5 – From 09.09.2005 to 11.04.2006
Company: LML Limited, Kanpur, U.P., India
Position: Assistant Manager – Paint Shop – QA/QC
Main tasks:
• The Company producing Scooters, Motorcycles etc. Efficiently managed the QA/QC activities of Paint Shop.
• The Painting plant involving the facilities of Plastics, Al, CS pretreatment lines, Josts electrostatic lines, State field line, Cathodic Electro-deposition plant (GEC Alsthom), Paints & Chemicals Testing lab, etc.
6 – From 15.02.2005 to 23.08.2005
Company: Sandhar Locking Devices Limited, Gurgaon, Haryana, India
Position: Assistant Manager – Paint Shop
Main tasks:
• The Company producing automotive components for Hero Honda, Honda Car Co. etc.
• Painting Plant involving the facilities of conveyerised Plastics components spray painting line, Oven, Testing lab etc. in co-ordination with Taikisha Engg. (I) Ltd.
7 – From 31.07.1986 to 30.11.2003
Company: I.T.I. Limited, Rae-Bareli, U.P., India
Position: Deputy Manager – Finishing
Main tasks:
• The Company producing Electronic & telecommunication exchanges, equipments etc.
• Joined the Company as Assistant Engineer then promoted to Engineer, Assistant Manager & Deputy Manager. Worked as Overall in-charge (Paint Shop / Electroplating Shop / Plastics Molding Shop & Effluent treatment plant), reporting to Deputy General Manager.
• Painting plant involving the facilities of seven tanks pretreatment line, Conveyerised spray painting lines, Epoxy powder coating line, Screen Printing, Paints & Chemicals Testing lab, etc. in co-ordination with Josts Engg. Co. Ltd.
• Electro-plating plant involving facilities of Zinc plating lines (Rack & Barrel), Tin plating, Nickel-Chrome plating, Anodizing, Lacquering, DM water plant, Testing lab, Acid-alkali, Cyanide & Chromium effluent treatment plant etc. in co-ordination with Grauer & Weil (I) Ltd.
• Plastics Injection Molding shops involving the facilities for producing the components of Nylon, Polypropylene, Polyethylene etc by Alburj all-rounder, Billion 5 tons, 30 tons, 140 tons injection molding machines etc.
8 – From 20.09.1984 to 26.07.1986
Company: Camphor & Allied Products Limited, Bareilly, U.P., India
Position: Plant Engineer
Main tasks:
• Efficiently managed the functioning of project & production of Fenvelerate Pesticide distillation plant & Effluent treatment plant.
• Installation and commissioning of mild steel, glass lined reactors, pressure vessels, condensers, agitators, filtration equipments, pneumatic controlled electronic instruments, acid-alkali reaction tank, scrubbers, sedimentation tank, sludge drying beds and sodium cyanide waste water effluent treatment plant etc.
Training
• PDO HSE Training, H₂S Awareness & Escape (Escape Hood) Entry Permit etc.
For further information on our international agency and available workers please contact us today (click here)
BackIf you are interested in new employment opportunities please register on our website (click here)
Back