Bachelor of Technology (4 year degree) in Mechanical Engineering
Experience\r\n2014 – PRESENT BECHTEL CORPORATION\r\n\r\nLOS PELAMBRES DESALINATION PLANT FEED (CHILE) \r\n\r\n• Conceptual plot plan development for Desalination Plant.\r\n• Work Breakdown Structure Numbering for the layout.\r\n• Equipment & piping modelling for the plant to generate basic mto for FEED.\r\n• Consolidating MTO from SP3D model for the plant.\r\n\r\nLYONDELL BASELL HYPERZONE HDPE PROJECT (Lyondell Basell,U.S) \r\n\r\n• Pellet Extrusion Unit:- Equipment & piping layout\r\n\r\nPERTAMINA FEED (Balikpapan Refinery ,Indonesia) \r\n\r\n• Conceptual unit plot plan development for Alkylation & Diesel Hydrotreating Units.\r\n• Piping studies for Alkylation unit.\r\n• Generating MTO from SP3D model.\r\n• Estimating unmodelled content.\r\n\r\nBITUMEN BLOWING UNIT (HMEL Bhatinda Refinery ,India) \r\n\r\n• Developed piping studies for interconnecting piping from Tie-ins to ISBL/OSBL.\r\n• Preparation of Piping GAD’s for Interconnecting Areas.\r\n• ISBL Model preparation for 90% model review.\r\n\r\n\r\nBAGHDAD ELECTRICAL POWER STATION PROJECT (Baghdad, Iraq) \r\n\r\n• Responsible for piping studies, equipment layout, Piping quantity estimate, Equipment & Pipe modeling, Equipment Orientation and Elevation drawings, Vendor print review, Interdisciplinary coordination & model reviews.\r\n• Handled Main Steam & Condensate, Steam Turbine, Feed water & CCW Systems independently.\r\n\r\nSTONEWALL ENERGY PROJECT (U.S) \r\n\r\n• System Engineer for Condensate, Circ. Water & Close Cooling Water Systems.\r\n• Tank Storage Area.\r\n\r\n\r\n\r\n\r\n2011 – 2014 TECHNIP KTI LTD.\r\n\r\n\r\nFIRED HEATER AREA-TUPRAS REFINERY (Turkey)\r\n• Lead & coordinate plant layout team to complete Detail Design for the project.\r\n• Piping Layout Checking (Clash checks, maintenance & operator access req, etc.\r\n• Prepared pipe support standard & special pipe supports for the project.\r\n• Undertook large bore isometric checking of isometrics.\r\n\r\nIOCL-LNG ENNORE PROPOSAL\r\n• Lead a team of designers/engineers to successfully complete MTO for the proposal under tight schedule.\r\n• Prepared Final Bid Proposal for EPC in coordination with piping lead.\r\n\r\nRELIANCE OFF GAS CRACKER UNIT-J3\r\n• Responsible Engineer for an area comprising of cryogenic equipment and piping (Cold conservation insulation norms).\r\n\r\nCONTINUOUS CATALYTIC REGENERATION), ALGIERS REFINERY PROJECT\r\n• Plant design and Piping Layout for CCR Unit (Continuous Catalytic Regeneration).\r\n• Equipment, Piping & Support modeling using Intergraph SP3D software.\r\n• Conducting model review sessions for clients at various stages of projects using SPR.\r\n\r\n\r\n2007 – 2011 M/s Reliance Industries Limited\r\n\r\n\r\nVGO & CRUDE UNIT, JAMNAGAR EXPORT REFINERY PROJECT(JERP)\r\n\r\n• Plant design and Piping layout responsibilities for VGO & Crude unit.\r\n• Isometric extraction, checking, error fixing and issuing.\r\n• Successfully completed the Steam Tracing Schedule of VGO unit.\r\n
For further information on our international agency and available workers please contact us today (click here)
BackIf you are interested in new employment opportunities please register on our website (click here)
Back