userskills like '%overhead transmission linesworker%' or userskills like '%overhead transmission linesman%' or userskills like '%electrical maintenance%' or userskills like '%power generation%' or userskills like '%electrical engineer%'Select id, profile_id, post_title from profiles_meta where 1=(userskills like '%overhead transmission linesworker%' or userskills like '%overhead transmission linesman%' or userskills like '%electrical maintenance%' or userskills like '%power generation%' or userskills like '%electrical engineer%') and profile_id<169768 order by profile_id desc limit 0,10

Linesman seeking opportunities abroad

Available
Experienced electrical engineer with a passion for power systems and a background in linesman work.
Serial No: 169768
Skills keywords: overhead transmission linesman, overhead transmission linesworker, transmission engineer.
List Of Qualifications & Related Skills:

Power line design and Construction of 66KV, 33KV, 11KV, 415V and 240V.\r\nPower plants\r\nErection of 132kv, 66kv and 33kv substations\r\nInstallation, testing and commissioning OPGW fiber.\r\nInstallation and commissioning of Off-grid solar photovoltaic.\r\nInspection of electrical & instruments installation as per the given details.\r\nDetailed Engineering, Erection, Testing, Troubleshooting & Maintenance of electrical equipments\r\nTeam and sub-contractors administration.\r\nSite survey, BOQs preparation and Supervision.\r\nReport writing and presentation.

Interests & Hobbies:

- Building electronic circuits\r\n- Programming microcontrollers\r\n- Designing and testing power systems \r\n- Experimenting with different electronic components \r\n- Troubleshooting and repairing electronic devices \r\n- Creating and improving automation systems \r\n- Researching and staying up-to-date with new technologies in the field \r\n- Developing software for controlling electrical systems \r\n- Collaborating with other engineers to design and develop new products or systems

Previous Employment Details:

Work Experience\r\nElectrical Shift Engineer Kenya Electricity Generating Company Limited -KENGEN\r\nLocation: Olkaria – Geothermal Division\r\nPeriod: July 2020 – Date\r\n Initiate, supervise, monitor, and provide technical guidance on repairs and maintenance of plant machinery\r\n Develop technical specifications and terms of reference for the procurement of spares and/ or services for the repair of equipment\r\n Support timely installation and commissioning of new machines and electrotechnical systems in line with LOTO and maintenance of high voltage (HV)& low voltage (LV) switch gears and automatic systems in the Engineering room/ main substation\r\n Prepare a sectional monthly schedule for the manpower\r\n Plan, supervise, and prepare regular reports on preventive maintenance as per the schedule to the maintenance manager\r\n Supervise contractors on various electrical assignments, by providing technical assistance\r\n Directly responsible for the installation and commissioning of transformers and substations\r\n Ensure staff training and staff development is carried out in accordance with the training calendar.\r\n Ensures that there is focus, direction, and control of QMS audits with proper planning of internal audit & management and addressing of non-conformities and corrective actions.\r\n Ensuring that the Quality Policy and Quality objectives are established and are compatible with the strategic direction and the framework of the organization.\r\n Ensure mandatory PPEs are properly and effectively used by all your Team members while at the workplace.\r\n Ensure that all your Team members adhere to safety policies and work instructions.\r\n Assess the risk of identified hazards in the context of the organization’s OHS management system.\r\n Ensure that all reported job safety observations by the Team members are followed up and closed out.\r\n\r\nConstruction Engineer Lukenya Greens Ltd & Shailee\r\nProject Name: Kenya Electricity Modernization Project (KEMP); LOT 3\r\nClient: Kenya power\r\nFinancier: World Bank\r\nProject duration January 2020 to May 2020\r\n Coordinating subcontractors (teams) in ten counties in western Kenya and Nyanza Regions.\r\n Liaising with Kenya Power engineers for shutdown, inspection, and other related activities.\r\n Preparation of weekly schedules and share them with the consultant.\r\n Overseeing all the construction works and allocation of work to the sub-constructors.\r\n\r\nSenior Electrical Engineer Meru Supreme Industries Limited\r\nProject Name: Kenya Electricity Modernization Project (KEMP); Phase 2 LOT 11\r\nClient: Kenya Power and lighting co. Ltd\r\nFinancier: African Development Bank (AFDB)\r\nProject duration: December 2018 to Sept 2019\r\nResponsibilities\r\n Head design and construction sections\r\n Coordinating all electrical teams, both in the last-mile connectivity project and production departments.\r\n Inspection of lines and picking as built coordinates using MapIt App\r\n Re-designing of power lines where there are wayleaves problems\r\n Construction of 33KV, 11KV, 415V and 240v Power lines.\r\n Liaising with Kenya Power engineers for shutdown, inspection, and other related activities.\r\nElectrical Engineer Foto Energy Systems L.L.C (U.A.E)\r\nProject Name: 100MW HFO Ezra Power Plant -18V32 Wartsila Engines\r\nClient: Government of South Sudan\r\n\r\nEPC contractor: Foto Energy Systems L.L.C\r\nDuration: March 2018 to October 2018.\r\nResponsibilities.\r\n Fully comprehend and interpret the project electrical engineering construction, control system & instrumentation drawings and all other project-related electrical & electronics documents.\r\n Regularly inspect and confirm that all project’s electrical construction & installation work is being performed as per drawings and specifications as described in the electrical engineering project documents.\r\n Ensure that “Quality Assurance & Quality Control” activities as described in the project’s electrical documents are being performed and all the prescribed standards & specifications are being adhered to.\r\n Ensure that the project’s “electrical installation schedule” is implemented as per the client expectation.\r\n Confirm the integration of the Panel Room, Power Transformers, Switchyard; Substation Panel room and Power evacuation lines is as per electrical design & drawings.

Current location:  Tharaka-Nithi County, Kenya - View on map
Nationality: Kenyan
Preferred Sector of Employment:  Engineering, Oil, Gas and Energy, Manufacturing and Operations
Spoken languages: english
Location I am interested in working: Anywhere