Power line design and Construction of 66KV, 33KV, 11KV, 415V and 240V.\r\nPower plants\r\nErection of 132kv, 66kv and 33kv substations\r\nInstallation, testing and commissioning OPGW fiber.\r\nInstallation and commissioning of Off-grid solar photovoltaic.\r\nInspection of electrical & instruments installation as per the given details.\r\nDetailed Engineering, Erection, Testing, Troubleshooting & Maintenance of electrical equipments\r\nTeam and sub-contractors administration.\r\nSite survey, BOQs preparation and Supervision.\r\nReport writing and presentation.
- Building electronic circuits\r\n- Programming microcontrollers\r\n- Designing and testing power systems \r\n- Experimenting with different electronic components \r\n- Troubleshooting and repairing electronic devices \r\n- Creating and improving automation systems \r\n- Researching and staying up-to-date with new technologies in the field \r\n- Developing software for controlling electrical systems \r\n- Collaborating with other engineers to design and develop new products or systems
Work Experience\r\nElectrical Shift Engineer Kenya Electricity Generating Company Limited -KENGEN\r\nLocation: Olkaria – Geothermal Division\r\nPeriod: July 2020 – Date\r\n Initiate, supervise, monitor, and provide technical guidance on repairs and maintenance of plant machinery\r\n Develop technical specifications and terms of reference for the procurement of spares and/ or services for the repair of equipment\r\n Support timely installation and commissioning of new machines and electrotechnical systems in line with LOTO and maintenance of high voltage (HV)& low voltage (LV) switch gears and automatic systems in the Engineering room/ main substation\r\n Prepare a sectional monthly schedule for the manpower\r\n Plan, supervise, and prepare regular reports on preventive maintenance as per the schedule to the maintenance manager\r\n Supervise contractors on various electrical assignments, by providing technical assistance\r\n Directly responsible for the installation and commissioning of transformers and substations\r\n Ensure staff training and staff development is carried out in accordance with the training calendar.\r\n Ensures that there is focus, direction, and control of QMS audits with proper planning of internal audit & management and addressing of non-conformities and corrective actions.\r\n Ensuring that the Quality Policy and Quality objectives are established and are compatible with the strategic direction and the framework of the organization.\r\n Ensure mandatory PPEs are properly and effectively used by all your Team members while at the workplace.\r\n Ensure that all your Team members adhere to safety policies and work instructions.\r\n Assess the risk of identified hazards in the context of the organization’s OHS management system.\r\n Ensure that all reported job safety observations by the Team members are followed up and closed out.\r\n\r\nConstruction Engineer Lukenya Greens Ltd & Shailee\r\nProject Name: Kenya Electricity Modernization Project (KEMP); LOT 3\r\nClient: Kenya power\r\nFinancier: World Bank\r\nProject duration January 2020 to May 2020\r\n Coordinating subcontractors (teams) in ten counties in western Kenya and Nyanza Regions.\r\n Liaising with Kenya Power engineers for shutdown, inspection, and other related activities.\r\n Preparation of weekly schedules and share them with the consultant.\r\n Overseeing all the construction works and allocation of work to the sub-constructors.\r\n\r\nSenior Electrical Engineer Meru Supreme Industries Limited\r\nProject Name: Kenya Electricity Modernization Project (KEMP); Phase 2 LOT 11\r\nClient: Kenya Power and lighting co. Ltd\r\nFinancier: African Development Bank (AFDB)\r\nProject duration: December 2018 to Sept 2019\r\nResponsibilities\r\n Head design and construction sections\r\n Coordinating all electrical teams, both in the last-mile connectivity project and production departments.\r\n Inspection of lines and picking as built coordinates using MapIt App\r\n Re-designing of power lines where there are wayleaves problems\r\n Construction of 33KV, 11KV, 415V and 240v Power lines.\r\n Liaising with Kenya Power engineers for shutdown, inspection, and other related activities.\r\nElectrical Engineer Foto Energy Systems L.L.C (U.A.E)\r\nProject Name: 100MW HFO Ezra Power Plant -18V32 Wartsila Engines\r\nClient: Government of South Sudan\r\n\r\nEPC contractor: Foto Energy Systems L.L.C\r\nDuration: March 2018 to October 2018.\r\nResponsibilities.\r\n Fully comprehend and interpret the project electrical engineering construction, control system & instrumentation drawings and all other project-related electrical & electronics documents.\r\n Regularly inspect and confirm that all project’s electrical construction & installation work is being performed as per drawings and specifications as described in the electrical engineering project documents.\r\n Ensure that “Quality Assurance & Quality Control” activities as described in the project’s electrical documents are being performed and all the prescribed standards & specifications are being adhered to.\r\n Ensure that the project’s “electrical installation schedule” is implemented as per the client expectation.\r\n Confirm the integration of the Panel Room, Power Transformers, Switchyard; Substation Panel room and Power evacuation lines is as per electrical design & drawings.
For further information on our international agency and available workers please contact us today (click here)
BackIf you are interested in new employment opportunities please register on our website (click here)
Back