userskills like '%mechanical engineer%' or userskills like '%qa qc activities%' or userskills like '%mechanical & construction%'Select id, profile_id, post_title from profiles_meta where 1=(userskills like '%mechanical engineer%' or userskills like '%qa qc activities%' or userskills like '%mechanical & construction%') and profile_id<47761 order by profile_id desc limit 0,10

CV, QA/QC Material Engineer Mechanical available

Unavailable
Serial No: 47761
Skills keywords: mechanical & construction, mechanical engineer, qa qc activities
Current location:  United Arab Emirates - View on map
Nationality: Pakistan
Preferred Sector of Employment:  , Oil, Gas and Energy
Spoken languages: English /arabic/Urdu
Location I am interested in working: Anywhere

Career Objective:-

Seeking new challenging job which is parallel to my professional experience and abilities. Be one of the key of the company’s vision into realization through strong dedication, hard work and good leadership skills to enable the organization to deliver strategic new initiatives on time, within budget and scope. Make my learning curve to move in linear fashion along with growth of my functional skills coupled with overall personality development in order to face the challenging time ahead

 

Academic Background

2005 BTE Peshawar, Pakistan

Mechanical Engineering

2002 SSC from Swat board intermediate and secondary

Education, Pakistan

 

Client : Saudi ARAMCO, Jeddah Saudi Arabia

PROJECT : King Abdullah Sports City

Contractor : Hyundai.ElSeif Engineering company Saudi Arabia(JV)

Duration : 9th July 2013 TO present

Appointment : MECH.QA QC/material/InspectionEngineer

(SAUDI ARAMCO Inspection department Approved)

Responsibilities

· Ensuring quality control site surveillance

· Attending witness inspection and test ,according to the approved

SATIP and SAIC,s .Preparation of ITP & inspection checklist.

· Preparation of the material inspection report and inspection of material.

· Preparation progress report daily weekly monthly.

· Verifying the inspection reports and validating the results.

· In addition to attending inspection and test as per the approved SAITP,S and SAIC,s and continually inspect the work site .

· All QA QC documentation works.

· Monitoring the timely production of the inspection certificate by construction department and Sub contractor.

· Ensuring the proper disposition of the non-conformities.

· Identification to QCS any quality related problems.

· Material inspection internal & assess the SAUDI ARAMCO.

· Prepare RFI and inspection with client at site.

· Inspection of receiving material at site.

· Preparation of material submittals.

· Preparation of material submittal of infrastructure works .Sewerage work, storm water works, irrigation work and potable water work.

· Materials used and inspected in this project are below.

· PIPES

· Material for Fire Fighting, Chilled water, Fire Hydrants, Plumbing And Infrastructure pipeline such as sewerage, Storm water, Potable water and Irrigation pipeline Installation, landscape.

· HDPE pipe ,Ductile iron pipe, uPVC pipe, PVC pipe, Carbon Steel pipe, Flange Adaptor, Dismantling joint,

· Sewerage, Stormwater, Irrigation, Potablewater network installations, pipe trenches, bedding and support materials. Factory acceptance tests for pipe work, manholes, road works associated with Sewerage, Stormwater, Irrigation, Potablewater networks installations& Material receiving inspection at site & Store also for Landscape work.

· Fabricated steel Structural Material

· Columns, Beams, Trusses, Bracing, Joists, Grating, Railings, Ladders etc

· Material converse ASTM, ASME, British Standard.

· HVACSystem

· Quality Inspection & Installation of HVAC equipment – Refrigeration/Air Conditioning equipment like compressor, condenser, and evaporator, Fans and control system.

· Prepare and implement inspection and test plan based on project specification, codes and standards SMACNA, UMC & ASHRAE.

· Supervision of construction activities like installation of Air Handling Unit and, Installation of ventilation systems including all exhaust fans motor, controllers and duct work with exhaust air terminal units supports, Motorized dampers, motorized fire Smoke Damper, Volume damper, Motorized Volume Damper, Pressure Relief Damper, Back draft damper and all accessories.

· Supervision of installation of chilled water pipe line.

· Equipment like AHUs,FCUs,VAV,CAV,Fire Dampers, Ducts &Accessories’.

· Fire Fighting, Fire Hydrant,Fire extinguishers, Fire hose reels, sprinkler systems, Chilled Water, Elevator, and Escalator materialInspection.

Employer : TetraEmiratesGen. Cont&Maint.Co.LLC.

Abu Dhabi, UAE

Client : Sorouh Real Estate / Urban Planning council

Abu Dhabi, UAE

Project Manager : Project Management Design Consultant.(PMDC)

Abu Dhabi, UAE

Consultant : WSP Middle East UAE

Duration : 5th SEP 2011 TO 30thMay 2013

Appointment : QA QC/Material Engineer

Project Handling : Watani Residential Development Phase.2,

Abu Dhabi, UAE

AL Raha Gardens Attached Housing Abu Dhabi, UAE

Consultant : EWAN Middle East UAE

Responsibilities

· Prepare compliance statement for Infrastructure works according to the related specification.(Irrigation, storm water ,Sewerage and water supply pipeline works.

· Prepare material submittal for Infrastructure works according to the

related specification Irrigation, storm water ,Sewerage and water

supply pipeline works.

· Sewerage, Stormwater, Irrigation, Potablewater network installations, pipe trenches, bedding and support materials. Factory acceptance tests for pipe work, manholes, and road works associated with Sewerage, Stormwater, Irrigation, Potablewater networks installations& Material receiving inspection at site & Store also for Landscape work.

· Co-ordinate with the consultant about the material submission.

· Prepare method of statement for Infrastructure works according to the related specification.(Irrigation, storm water ,Sewerage and water supply pipeline works.

· Prepare the Infrastructure IR & Inspection with consultant.

· Prepare the log sheet for all documents updating on regular basis

· Manage and monitoring the daily activities on site.

· Prepare MIR and get the delivered on site material approval from consultant.

· Monitoring the store regarding the proper storage of material as per given

Material safety data sheet and manufacture recommendations.

· Prepare Monthly, weekly and Daily progress report.

· Close out for NCR and also coordinate with consultant & Contractor.

· Material used in project ,Ductile iron pipe & Ductile iron fittings HDPE pipe ,uPVC pipe, PVC pipe, Carbon Steel pipe, Flange Adaptor, Dismantling joint,

Employer: Fiber Flex Factory LLC Abu Dhabi, UAE

Client : Abu Dhabi National Hotels. Abu Dhabi, UAE

Management : MACE International Ltd. Abu Dhabi, UAE

Consultant : OTAK International Ltd. Abu Dhabi, UAE

Main Contractor: AL Habtoor Engineering Leighton Group Abu Dhabi, UAE

Duration : 18th SEP 2010 TO 04th SEP 2011

Appointment : QA QC/Material/Site Engineer

Project Handled : The Ritz Carlton Abu Dhabi Grand CanalAbu Dhabi, UAE

Responsibilities

· I was responsible for insuring quality in its limits.

· Axial Tensile strength test and Flexural strength tests on testomatric test machine.

· Loss on Ignition test on Furnas.

· Water Absorption test on oven. Ensure that subcontractors operate in a safe manner and comply with the

Project policy .

· Preparation of test report. Inspection of material in production and meeting

with consultant contractors and sub-contractors.

· Monitored working of facility and checked that all health and safety regulations were followed.

· Maintained work and performed tests on equipment’s.

· Inspected mechanical work in facility such as steel & concrete and GRP pipelines. GRP Manhole and installation and fabrication in production of facility and regulating tanks and pump stations.

· Controlling all the work done on the site by estimating the material & labor to execute such job based on the site situation.

· During duty I plan and solve all the safety issue and adapt the system for ISO 9001 and till date preparing for ISO 9014 for environment,

· Coordinated with management to achieve project goals.

· Daily and weekly & monthly progress report.

· Weekly meeting with contractor ,Consultant and client

· Implementation of Quality Plan based on the Client Specification and international standard codes referring the design and Quality Manual.

Ensure the result of inspection in accordance with project quality plan.

Employer : M/SPEPSI Cola Islamabad (Haidri beverages private ltd)

Duration : DEC-2006 -TO -DEC-2009

Appointment: Production& Material Inspection Engineer

Department: Production

Responsibilities

· I was responsible in PEPSI Cola for Production in shifts,& inspection of raw material .

· Inspection of material in store, also inspection of storage area.

· Prepare and effectively implement action plans to improve overall equipment efficiency of production machines.

· Day to day production planning and achieve maximum Production.

· Assign work load to operators & achieving daily production target.

· Arrangement of tools and repair & maintenance of tools.

· Monitoring of hourly production Vs hourly production plan.

· Technical problems Solving and Trouble Shooting.

· Proper utilization of manpower.

· Daily Tool consumption, Production reports preparation & canalization down time analysis.

· Tools history record preparation Coordinating with Planning, Purchase, Stores, Tool room,

· To encourage new product development activities and as well as Daily production activities. an individual possess the wide range of knowledge on manufacturing and production process, plays a crucial role in an organization,

· Liaising across various business professionals to deliver designs equipped for manufacture and providing solutions to the problems concerning the design and manufacturing process.

· And blow mold operation and blow mold maintenance and daily inspection of chiller.

Employer : Ittehad Steel Islamabad

Duration :Oct-2005 -TO -DEC-2006

Position : QA /QC/Material Engineer

Working Responsibilities

· I was responsible for Supervision & routine Operation and insuring quality in its limits.

· Tensile strength, elongation and bending tests on universal test machine.

· Preparation of test report,

· Inspection of furnace and rest of the plant for required maintenance, during shut down.

Employer : Oil and Gas Development Corporation ltd (OGDCL).

Duration : Oct-2004 -TO -Nov-2005

Position : Mechanical Maintenance Engineer

Project : Chanda Oil Fields

Working Responsibilities

· I was responsible for operation and routine maintenance of the Units below,

· Supervision of routine Operation & dehydration plant operation.

· Control of pressure and flow of oil and gas on well head.

· Control of pressure and flow of oil and gas in LP, MP and HP separator operation.

· Maintenance of dehydration plant. Storage tanks (water level),

· Decantation of water, daily tank input and output and production report.

· Also work for the development of environmental management systems,

· Worked for Health and Safety and ISO 9001 for Quality systems we use in our operations.

· I work in industry Learning and Development, as well as legislative training requirements.

Employer : TetraEmiratesGen. Cont&Maint.Co.LLC.

Abu Dhabi, UAE

Client : Sorouh Real Estate / Urban Planning council

Abu Dhabi, UAE

Project Manager : Project Management Design Consultant.(PMDC)

Abu Dhabi, UAE

Consultant : WSP Middle East UAE

Duration : 5th SEP 2011 TO 30thMay 2013

Appointment : QA QC/Material Engineer

Project Handling : Watani Residential Development Phase.2,

Abu Dhabi, UAE

AL Raha Gardens Attached Housing Abu Dhabi, UAE

Consultant : EWAN Middle East UAE






popup-img