userskills like '%mechanical engineer%' or userskills like '%maintenance and repairs%' or userskills like '%mechanical maintenance/commissioning%'Select id, profile_id, post_title from profiles_meta where 1=(userskills like '%mechanical engineer%' or userskills like '%maintenance and repairs%' or userskills like '%mechanical maintenance/commissioning%') and profile_id<48937 order by profile_id desc limit 0,10

CV, Mechanical Maintenance Engineer Looking Worldwide

Available
Serial No: 48937
Skills keywords: maintenance and repairs, mechanical engineer, mechanical maintenance/commissioning
List Of Qualifications & Related Skills:

Post Graduate diploma in Business Administration \r\nBachelor in Engineering - Mechanical

Previous Employment Details:

* Essar Steel India Ltd\r\n- I worked in Essar for more than 10 years in Steel Melting Plant as a Mechanical Maintenance Manager.\r\n\r\n* Mother Dairy\r\n- I had worked in Mother Dairy for around 1.5 years in Utility department as a Mechanical Maintenance/ Operation Engineer.\r\n

Current location:  Gujarat, India - View on map
Nationality: Indian
Preferred Sector of Employment:  , Manufacturing and Operations, General Management
Spoken languages: english, Hindi
Location I am interested in working: Anywhere

PROFESSIONAL EXPERIENCE

30th January 2006 –
ESSAR STEEL LTD., HAZIRA, SURAT, GUJARAT
Department : Steel Melting Plant

MANAGER (MECHANICAL MAINTENANCE)

Work Profile : Presently I am working as mechanical maintenance manager in EAF area of steel melting plant. My work contains,

• Maintenance of EAF (150T), LF (150T) and other related equipment like Carbon dispensing system, Oxygen valve stand, wire feeder, LTC and necessary related spares.

• Maintenance of Material feeding system & Fume extraction system.

• Maintenance of EOT cranes from capacity of 12 tons to 320 tons.

• Preparation and maintaining spares used in EAF & LF.

• Execute Preventive, Predictive and Corrective maintenance.

• Handling shift activity.

• Active participation in plant troubleshooting as well as plant start-up and shutdown activities.

• Equipment inspection / checking to know malfunction or deterioration.

• Continuous reduction of maintenance cost through:

a) Reducing the maintenance itself (Maintenance Prevention)

b) Improvement of maintenance procedures & standards.

c) Improvement of design (Simplification & Modification)

d) Reduction in inventory cost by standardization of equipment / spares.

• Doing regularly FMEA projects as well as QC projects to solve problems on shop floor.

• Doing Poka-Yokee, Checklist preparation for mistake proofing activity.

• Core team member for implementing and maintaining 5’s methodology in plant.

• Notifying all the jobs done in SAP R/3 PM module.

• Scheduling shutdown orders and confirmation after scheduling (using SAP R/3).

• Maintaining high standards of safety and quality.

• Field training of subordinates.

Work Experience: 10 Years

12th June 2004 – 29th January 2006
AMUL, DIST. GANDHINAGAR, GUJARAT (DAIRY)
Unit of GCMMF Ltd.,
Department : Refrigeration Plant

ENGINEER

Work Profile :

• My work experience includes operation & maintenance of (-5 C) Refrigeration plant.

• Operation & Maintenance of ammonia screw compressors, chillers, chilled water pumps, cooling towers and condensers.

• Also worked in purchase dept. for procurement of various spares used in utility plant.

• Active participation in various energy saving projects.

• I am core team member in ERP installation project in Mother Dairy.

SKILLS

Technical skills:

Electric Arc Furnace, Ladle Furnace, EOT Crane

Computer Prof:

ERP, SAP (PM module), MS Office applications

QUALIFICATIONS

• MBA in Operation Management from Symbiosis with ‘A’ grade in May 2010. (Distant Learning)

• Bachelor in Mechanical Engineering from B.V.M. Engineering College, S.P. University with 8.59 CPI in June 2004.

PROJECTS/PRESENTATIONS

Projects/ Presentation Institution / organization Project Date

Eco Friendly Refrigerant National Level 25th Sep, 2003

ERP installation Amul 8th Mar, 2005

Energy Efficient pumps Amul 18th Sep, 2005

5’s methodology in SMP Essar Steel –

Various QC & FMEA projects Essar Steel –

EAF Miwenti upgradation Essar Steel Aug, 2009

Green Belt Project on “Improvement in Water Cooled Roof Reliability in EAF” Essar Steel Nov, 2011

 

 

 

 

 

 

 

 

 

 

 






popup-img