Education & Qualifications
2013 – 2015 University College Cork Diploma in Law
2008 – 2009 Dublin Institute of Tech. Assessor for Building Energy Rating
2008 – 2009 FAS – Fetac Level 6 On-Site Waste Water Treatment
1997–1998 University College Cork Diploma in Applied Project Management
1992-1996 University College Cork Bachelor of Engineering (Civil) Honours
Employment History
Free Lance Consulting Engineer. Cork, Ireland.
t/a Southwestern Architectural & Engineering.
March 2005 to present
Activities are:
• Project Management/ Oversee various construction projects including Domestic Houses, Agricultural Buildings, Commercial Buildings, Schools, Agricultural Under Passes, removal of contaminated soil (Conoco Philips), road planing and asphalt surfacing (Roadstone Ltd.)
• Complete planning applications, tendering process for contractors and tenders for public works under EU Tendering guidelines for publicly funded works.
• Complete construction drawings and other requirements of Building Control Act 2014, Ireland, including roles of Assigned Certifier & Assigned Designer.
• Act as Project Manager Design Process/ Project Co-Ordinator Construction Stage as required under Health and Safety Act 2013, Ireland.
• Apply to Local Government Authorities for Road Closure Licences & Road Opening Licences including Traffic Management Plans for works.
Main achievements:
• Successfully implement National Government Plans and Local Government Development Plans in the design and construction of both Urban and Rural Developments.
• Oversee projects from planning, applying for permits, tendering, contracts, construction and agreeing final accounts.
• Resolved disputes between clients and contractors.
• Successfully comply with Local Government requirements to secure Permits and Planning Permissions.
• Securing funding for clients and ensuring projects are completed within budget.
• Prepare presentations for clients and other stakeholders.
• Provide specialist advice to clients on planning and design of developments.
• Provide tender documents, contracts and scope of works for developments.
• Interface with Local Government, Developers and Contractors.
Resident Engineer. RPS Group, Ireland.
April 2001-March 2002
Contract: I was Resident Engineer on was the Charleville Water Supply Scheme, Cork.
I worked on behalf of the Local Government. Works included trunk and distributor water mains as well as individual connections to properties by micro tunnelling.
• Supervised contractor and ensured works were carried out according to contract and approving monthly account from contractor.
• Liaised with Local Government & Residents regarding road closures & diversions and water service shut off time. Approved traffic Management Plans.
• Reported to Local Government on progress of project.
• Costs to Local Government were kept to a minimum through ensuring works were kept within contract specifications and scope of works.
• Quality was maintained to ensure highest standard of finish.
• Participated in meetings and kept minutes/ notes of meetings.
• Received and evaluate reports and proposals from Contractor and Design Team.
Project Engineer/ Site Agent
BPH Civil Engineering Ltd, Ireland.
April 2004-Feburary 2005
Lyons Excavations Ltd, Ireland. April 2002- March 2004
McGinty & O’Shea Ltd, Ireland. February 2000-March 2001
Worked for Civil Engineering Contractors in the construction of Domestic Dwellings, Road Building, Pipelines.
• Cost control and billing were carried out to ensure project was profitable.
• Ensured works were carried out correctly and in compliance with drawings & tender documents.
• Ensured variations to contract were carried out and billed accordingly.
• Ordering and scheduling of materials, man power and machinery.
• Successfully managed direct employees and subcontractors.
• Planning and scheduling ensured projects were brought in on time and within budget.
• Set out works using GPS & Total Stations
Quarry Engineer, Roadstone Castlemore Quarries Ltd., Ireland
July 1996 to January 2000
Roadstone Castlemore Quarries is a Limestone Quarry with a Sandstone over burden.
• Completed road contracts within budget and on time.
• Ensured quality of products was maintained including concrete mix designs.
• Ensured quarry supply levels were maintained.
Other Information
• Date of Birth: 5th November 1973.
• Accreditation: Chartered Member of Institute of Engineers of Ireland.
For further information on our international agency and available workers please contact us today (click here)
BackIf you are interested in new employment opportunities please register on our website (click here)