Engineering Design Project\r\n Rejuvenation Project\r\n Turnaround Shutdown Project\r\n Engineering Maintenance Workpacks\r\n Solving Technical Issues\r\n Innovation and Creativity\r\n Detail oriented & efficient\r\n 3d AutoCadd, Pdms, Navisworks\r\n Microsoft Office (Word, Excel, PowerPoint)\r\n
2015 – 2018 (Kota Kinabalu office, Malaysia)\r\n Senior Civil-Structural Designer\r\n Responsible for the design of special pipe support of 24“ main header pipeline to mitigate the pipe vibration.\r\n Perform engineering support at offshore for the installation of special pipe support to mitigate pipe vibration.\r\n Perform engineering support for the 2017 KBB Turnaround by conceptualizing strategy for the removal & reinstatement of 300 number of shutdown valve and manual valve at offshore.\r\n Perform engineering support for the 22 tons shutdown valve replacement by conceptualizing handling strategy from top deck to sea deck installation\r\n Perform engineering support for the 100 tons boiler replacement by conceptualizing strategy for the removal & reinstatement without damaging nearby equipment/structure and ensuring no hicups during installation \r\n Responsible for the lifting plan & methodology of heavy lift valve, complicated handling installation and fabricated transport module\r\n\r\n Responsible for the structural framing modification, deck extension, special pipe supports, equipment support, service platforms and required steel detailing for Onshore & Offshore \r\n Built PowerPoint presentations using drawings and 3D models\r\n Demonstrated how drawings can be produced from 3D model for the structural department\r\n Perform supervision at offshore if required for critical installation \r\n Reviewed shop drawings for compliance with design specifications including connections, erectability and shipping limits. Ensured details were safe, of high quality and cost effective\r\n Conducted visits to fabricators for project start up and resolution for critical issues\r\n Provided technical support to 3rd party detailers using applicable Building and OSHA codes\r\n Coordinate with other engineering disciplines and communicate issues up the chain of command\r\n Troubleshot field issues and performed site visits as required for problem resolution \r\n Attend relevant meetings with client, such as HAZID, Design & Constructability Review, Model Review and PEER review\r\n Coordination of 3D modelling activities of the team with other lead discipline designers to maintain the clash free model\r\n Monitor the assigned package ensuring that the drafting activities are carried out within the established time schedule and within allocated budget of man-hour\r\n Perform checking for the drawings against basis and mark-ups before issuance to the supervisors for further quality checking\r\n Perform coordination with the assigned Drafting Team to ensure uniformity in design and drafting activities\r\n Provides technical support and guidance for all designers and drafters\r\n\r\nProject Involved:\r\n Kebambangan Petroleum (Malaysia) Consultancy, Engineering & Design\r\n
For further information on our international agency and available workers please contact us today (click here)
BackIf you are interested in new employment opportunities please register on our website (click here)
Back